
Solar Ground Mount
Double Ramming Pile
Fixed-tilt ground structures on PHC piles, ramming piles, concrete and ground screws.
CG301 Double ramming pile solution
ADVANTAGES OF PUNCHING PILE:
Simple and fast installation Instead of preparing cement base in advance the vertical shaft is punched into the ground (pile driving depth: 1500-2000mm) by a pile driver which greatly saves the installation time and cost.
Strong adaptability to installation site Punching pile has lower requests for surface flatness than traditional cement foundation and is its installation is not affected by the seasons.
Compatible with all type of structures The head of the punching pile can be adapted to whatever the customer’s need is (for example we have punching piles with flange plate and without flange plate)
Environmental friendly Without performing and preparation works the surrounding areas remain unspoiled. Besides without corruption and zero disposal costs the pile is totally recyclable complying with the environmental protection concept.
Easy and quick relocation Punching pile is easy to remove so that the installation site can be reused.








| Installation site | open area, lake and wetland |
|---|---|
| Installation angle | from 5°to 40°,according to customer’s feasibility study |
| Module | poly/mono/thin film |
| Material | HDG Steel/POSMAC Q235B&AL6063-T5 |
| Surface Treatment | Hot-dip galvanizing & anodizing |
| Wind load | up to 57m/s |
| Snow load | 0.5KN/M² |
| Foundation | Ramming pile |
| Anti-corrosive | HDG/VCI/SEBF |



If you are interested in our products, please feel free to send an e-mail to info@cmsolarcn.com
Or call us: +86 512 5893 9921 · WhatsApp +86 159 0616 4069
Inquire nowSolar Ground Mount
Related systems

PHC-Pile
View system
Single Ramming Pile
Simple and fast installation Instead of preparing cement base in advance the vertical shaft is punched into the ground (pile driving depth: 1500-2000mm)
View system
Single Pile with Cement Injection
View system




WeChat +86 159 0616 4059